MZR-1500
Overview
The MZR-1500 zinc recovery system has a capacity for 1500 kilograms (3300 pounds) of skimmings and a drum that is easier to load than the smaller MZR-750 model. The system’s heating chamber walls are lined with low thermal mass insulation for greater efficiency and its heating source is a system of high-efficiency burners. The system has also processed lead dross from the lead battery and sheet industry, and recovered zinc from new continuous galvanizing zinc-magnesium-aluminium (ZnMgAl) coating alloys.
Benefits
- Approximate six-month return on investment when calculating for 180 tonnes of dross per year
- Low operational cost; does not require dedicated staff
- No London Metal Exchange (LME) premium on recovered zinc
- Reduces the volume of residual skimmings for disposal
- Reduces the volume of virgin zinc purchased at LME rates
- Value in residual skimmings after zinc removal
1308 MZR-1500 EN | Datasheet | English |
1652 Zinc Recovery System MZR-1500 Flyer EN | Flyer | English |